PQC / CRYPTO-AGILITY / CBOM

Post-Quantum Readiness Dashboard.

Additional page sections

Classifies quantum-safe readiness stage and identifies the first evidence actions for post-quantum transition.

Version 2.1 Beta Protected engine Post-quantum readiness dashboard
PURPOSE

Decision supported.

Classifies quantum-safe readiness stage and identifies the first evidence actions for post-quantum transition.

Intended user

research, assurance and technical review teams

Output status

Preliminary outputHuman review requiredNot certification
USE CASES

Where this instrument fits.

  • Start a quantum-safe transition program
  • Prepare a first 90-day action plan
  • Communicate unknowns to executives
  • Prioritize inventory and supplier evidence
INPUTS

Required input fields.

  • Migration governance owner (required): Weak or unknown, Partial, Strong and evidenced
  • Crypto inventory maturity (required): Weak or unknown, Partial, Strong and evidenced
  • Data lifetime classification (required): Weak or unknown, Partial, Strong and evidenced
  • Supplier readiness evidence (required): Weak or unknown, Partial, Strong and evidenced
  • Protocol exposure review (required): Weak or unknown, Partial, Strong and evidenced
  • PKI and code-signing review (required): Weak or unknown, Partial, Strong and evidenced
  • Testing and interoperability (required): Weak or unknown, Partial, Strong and evidenced

Data handling: this interface uses the L2ET protected same-origin instrument engine. Do not enter confidential, regulated, privileged, incident, medical or sensitive operational data.

METHOD

Radar logic.

Maps governance, inventory, data lifetime, supplier, protocol, PKI and testing maturity to readiness stages from latent to managed.

Source families

NIST PQC source familycryptographic inventory practicecrypto-agility governance

Assumptions

  • Quantum-threat timing is uncertain.
  • Readiness depends on actual cryptographic discovery.
  • The stage is an orientation category.
INTERACTIVE INSTRUMENT

Post-quantum readiness dashboard.

Use the controls below to generate a preliminary artifact. The output is intentionally bounded and requires human review.

OUTPUT ARTIFACT

Post-quantum readiness dashboard.

The generated artifact includes findings, assumptions, limitations, recommended next actions and exportable structured output.

Export options

Copy outputMarkdownJSON
EXAMPLE

Example input and output.

Example input

Weak inventory, weak supplier evidence and partial protocol review.

Example output

Outputs initial readiness stage, highest-risk unknowns and first 90-day actions.

LIMITATIONS

What this tool does not do.

  • Does not scan systems.
  • Does not predict exact quantum computer timelines.
  • Does not certify algorithm compliance.

This instrument does not provide legal, medical, cryptographic, engineering, regulatory or compliance certification.

RELATED METHOD

Method and workflow links.

Read the family method note for assumptions, output artifacts, update policy and review boundaries.

Open methodology Open family

CHANGELOG

Version history.

  • v2.1 - Research-grade instrument template, method notes, assumptions, limitations, example and export actions added.
  • Last updated: 2026-05-27.
  • Maturity state: Beta.